Statnett

TSO - Norway

Publication info

Status of publication

Published

Link to website

WattApp

Accessibility

Open

Regional Scope

Country

Spatial granularity

Nodal (substation)

Operator voltage level scope

TSO - 420 kV, 300 kV and 132 kV

Timeline for which HC is provided

No specific time horizon

Information format

Map and Table

Categories of grid users considered

Generators and demand

Type of grid connection capacity information

Available

Availability of API

Not provided

Update Cycles

When needed

Available language

National language(s) + others including English

Hosting capacity assessment

Capacity type considered for hosting capacity information

Firm and flexible

Description of what firm capacity means and the aspects that structure the definition

Firm capacity is capacity available at all times of the year. Statnett retains the right to curtail demand and/or production in order to maintain system stability and security.

Description of the methodology that leads to firm capacity results

The firm capacity results are calculated with respect to thermal N-0 and N-1 limits in the Norwegian transmission grid (132–420 kV). The analysis is based on steady-state power flow calculations and Voltage analysis and sometimes dynamic behaviour. A number of representative scenarios have been analysed, with the most limiting scenario for each region determining the available capacity. Current grid utilisation is considered in order to estimate the remaining available capacity.

Description of what flexible capacity means and the aspects that structure the definition

Flexible capacity will be subject to a set of conditions. If these conditions are breached, all or part of the planned consumption must be disconnected.

Additional information for connection request and hosting capacity information

Connection request procedure

Tilknytningsplikt og introduksjon for tilknytningsprosessen | Statnett

Options available for the investors if the map shows 'no capacity available' in their interested area

All customer projects must apply for capacity through the national grid connection portal Tilko. They will get feedback on available capacity, and they have to provide documentation for maturity assessment. If the customer project is considered mature, the project will be put in capacity queue. If there is available capacity in the existing or planned grid, the customer project will get a reservation. If there is no available capacity, the relevant DSO and the TSO will provide information on the next steps towards getting a grid connection.

Connection request rules

First-come-first-serve

Information published for volumes of connection requests/waiting lines

Yes

Granularity of published connection requests/waiting lines

All projects that has reserved capacity and all projects in queue will be published on the TSO website.

Additional information

First, they must contact the relevant DSO.