Stredoslovenská distribučná, a.s. (SSD)

DSO - Slovakia

Publication info

Publication status

Published

Access link to GHC publication of the SO

https://www.ssd.sk/vyrobcovia-elektriny/prehlad-cerpania-pridelenych-vykonov?page_id=6335

Access type

Open

Geographical Coverage

DSO area of Stredoslovenská distribučná, a.s.

Spatial granularity

Regional

Voltage Level Coverage

MV and LV

Time Horizon (e.g. Y+1, Y+3 / 202x / snapshot)

Information of Available capacity is updated monthly

Data Format (Table, Map, etc.)

Map

Grid user types covered

Generation at MV and LV voltage levels

Displayed Capacity Type (e.g. available/requested/reserved/connected etc.)

Available capacity

API Availability

Not Applicable

Grid hosting capacity downloadable & format

Interactive map on web

Update Frequency

Monthly

Available language

National language(s) only

Disclaimer & Important Notes

The information is indicative. Available capacity is confirmed only through the connection request assessment.

Hosting capacity assessment

Capacity type considered for available hosting capacity information (e.g., Firm and/or Flexible)

Firm

Description of what firm capacity means

Displayed available capacity applies to a connection point directly at the transformer station.

Description of the aspects/methodology that leads to firm capacity results

Firm capacity is established through a technical assessment of the distribution network, considering the voltage level, transformer parameters, associated feeder circuits, operational constraints, reliability criteria, and the secure operation of the distribution system

Description of what flexible capacity means (if applicable)

Flexible capacity defines the amount of generation capacity or electricity storage capacity that can potentially be connected to the distribution system under specific technical and contractual conditions.

Description of the aspects/methodology leading to flexible capacity results

Where the connection of a generation facility at the requested total installed capacity is not possible, the option of a flexible connection may be considered. The available connection arrangements are defined by the applicable primary legislation.

Description for the criteria and methodologies used that lead to the published information

The published flexible connection opportunities are provided for information purposes only and are non-binding. Each request for a flexible connection is evaluated on an individual basis following the submission of a complete flexible connection application.

Main assumptions/disclaimers behind calculations

The non-binding information on available capacity displayed in the map interface (hereinafter referred to as the “non-binding values”) for HV/MV substations and MV/LV substations (distribution transformer substations) within the distribution system is of an indicative nature only. The published values represent the potential available power capacity at the MV busbar level of the respective substation and at the LV level of the respective distribution transformer substation.

Additional information for connection request and hosting capacity information

Connection request procedure The preferred method for submitting an application is electronically via the WPSŽ portal at wpsz.ssd.sk. Each application shall be subject to an individual assessment following the submission of a complete application. The published map of available connection capacity for demand customers is indicative in nature only and does not constitute a binding commitment by the Distribution System Operator.
Available options for the investors if the map shows “no capacity available” in their interested area In any case, it is recommended to submit a connection application. Each application is assessed individually, with due consideration given to the technical data and other information provided in the application.
Connection request rules/principles The submission of a complete connection application is a prerequisite for initiating the assessment process. The application can only be assessed once all required information has been provided. In principle, applications are processed on a first-come, first-served basis.
Information published for volumes of connection requests/waiting lines Partly
Granularity of published connection requests/waiting lines (e.g., nodal, regional, per SO) Not Applicable

Relevant references/Links/Additional material

Connection request process

Výrobcovia elektriny, Naše služby, Stredoslovenská distribučná, a.s.

Auxiliary documents

Dokumenty, Stredoslovenská distribučná, a.s.

Legal references

Applicable Slovak energy legislation and SSD technical conditions.

Contact point for hosting capacity information

Stredoslovenská distribučná, a. s., Pri Rajčianke 2927/8, 010 47 Žilina; prevadzkovatel@ssd.sk; 0850 166 007

Contact point for connection requests

VPSŽ - Podanie žiadosti

Supplementary additional information

Further details depend on the specific type of connection request and technical assessment by SSD.