STOEN OPERATOR

DSO - Poland

Publication info

Publication status Published
Access link to GHC publication of the SO https://www.stoen.pl/files/2025-10/wielkosc-dostepnej-mocy-przylaczeniowej-zrodel-w-sieci-stoen-operator-iv-kw-2025.pdf
Access type Discussion in progress
Geographical Coverage DSO area
Spatial granularity Not Applicable
Voltage Level Coverage Voltage level above 1kV
Time Horizon (e.g. Y+1, Y+3 / 202x / snapshot) Y+5
Data Format (Table, Map, etc.) Table
Grid user types covered Discussion in progress
Displayed Capacity Type (e.g. available/requested/reserved/connected etc.) Available as a table on the DSO website
API Availability Not Applicable
Grid hosting capacity downloadable & format No
Update Frequency Discussion in progress
Available language National language(s) only

Hosting capacity assessment

Capacity type considered for available hosting capacity information (e.g., Firm and/or Flexible) Firm
Description of what firm capacity means Available power on the date of preparation of the document
Description of the aspects/methodology that leads to firm capacity results Engineering calculations on a grid model (PLANS programme)
Description for the criteria and methodologies used that lead to the published information Technical parameters of existing grids and changes to these parameters as a result of planned investments
Main assumptions/disclaimers behind calculations Taking into account the power demand and the power resulting from the issued connection terms, considering the existing and planned network status

Additional information for connection request and hosting capacity information

Available options for the investors if the map shows “no capacity available” in their interested area Alternative options are being considered in neighbouring locations within the urban agglomeration, where the proximity between stations is high, with 90 power distribution points located within an area of 500 km².
Connection request rules/principles First come, first served
Information published for volumes of connection requests/waiting lines No

Relevant references/Links/Additional material

Calculation method, disclaimers, and boundaries

Internal procedures + PLANS

Connection request process

Chcę przyłączyć się do sieci | Stoen Operator https://www.stoen.pl/strona/chce-przylaczyc-sie-do-sieci

Auxiliary documents

Portal przyłączeniowy Stoen Operator: https://przylacza.stoen.pl/skladanie-wniosku

Legal references

Prawo Energetyczne' Act, System Regulation, DSO Tariff 2025, IRIESD Network Codes, IRIESP: https://isap.sejm.gov.pl/isap.nsf/download.xsp/WDU19970540348/U/D19970348Lj.pdf

Contact point for hosting capacity information

Customer Service Office – Distribution, ul. Rudzka 18, 01-689 Warsaw

Contact point for connection requests

Customer Service Office – Distribution, ul. Rudzka 18, 01-689 Warsaw