TransnetBW

TSO - Germany

Publication info

Status of publication Published
Link to website https://www.transnetbw.de/de/transparenz/netzzugang-und-entgelt/netzanschlusskarte
Accessibility Open
Regional Scope TransnetBW grid control area in germany
Spatial granularity Nodal (substation)
Operator voltage level scope 380, 220 kV
Timeline for which HC is provided 2032, 2035
Information format Map
Categories of grid users considered Generators and demand
Type of grid connection capacity information The hosting capacity is only specified at available locations and is categorised into classes: less than 500 MW, 500–1,000 MW, 1,000–1,500 MW and 1,500–2,000 MW.
Availability of API Not provided
Update Cycles When needed
Available language National language(s) only

Hosting capacity assessment

Capacity type considered for hosting capacity information Firm
Description for the criteria and methodologies used that lead to the published information The assessment of connection capacities is based on existing and specifically planned switchgear bays as well as newly planned substations. This evaluation takes into account current grid utilisation and all relevant technical constraints to ensure reliable and realistic information.
Main assumptions/disclaimers behind calculations The grid connection points illustrated on the grid map and the available grid connection capacities are based on the best available assessment and state of knowledge as of 1 April 2026. They constitute a non-binding indication of potential connection options. No legal entitlement to a grid connection may be derived from the publication of the grid map. Any connection request remains subject to a detailed technical analysis and assessment as part of a grid connection study.

Additional information for connection request and hosting capacity information

Connection request procedure https://www.transnetbw.de/de/transparenz/netzzugang-und-entgelt/ueberblick-netzanschluss
Options available for the investors if the map shows 'no capacity available' in their interested area Wait for an update with available capacity, or contact the TSO for further information.
Connection request rules First-ready-first-serve
Information published for volumes of connection requests/waiting lines No

Relevant references/Links/Additional material

Contact point for hosting capacity information
Contact point for connection requests