Amprion
TSO - Germany
Publication info
| Status of publication |
Availability of switchgear bays is published |
| Link to website | |
| Accessibility |
Open |
| Regional Scope |
Amprion control zone |
| Spatial granularity |
Nodal (substation) |
| Operator voltage level scope |
380 kV/220 kV/(partially) 110 kV (no publication for 110 kV) |
| Timeline for which HC is provided |
Currently no capacity published |
| Information format |
NA |
| Categories of grid users considered |
NA |
| Type of grid connection capacity information |
Currently not published |
| Availability of API |
NA |
| Update Cycles |
NA |
| Available language |
National language(s) only |
| Additional information |
Amprion currently publishes the availability of switchgear bays. |
Hosting capacity assessment
| Capacity type considered for hosting capacity information |
NA |
| Description of the methodology that leads to firm capacity results |
Connection request has a fixed capacity, the implementation of which is being examined. |
| Description of the methodology that leads to flexible capacity results |
Considered: In case of bottlenecks, flexible solutions are being examined. |
| Description for the criteria and methodologies used that lead to the published information |
Currently not published |
| Main assumptions/disclaimers behind calculations |
Currently not published |
Additional information for connection request and hosting capacity information
Relevant references/Links/Additional material
Connection request process
Contact point for hosting capacity information
Contact point for connection requests

