50Hertz

TSO - Germany

Publication info

Status of publication

Published

Link to website

https://www.50hertz.com/de/Vertragspartner/Netzkunden/Netzanschluss

Accessibility

Open

Regional Scope

50Hertz grid control area in Germany

Spatial granularity

Nodal (substation)

Operator voltage level scope

380 kV

Timeline for which HC is provided

snapshot

Information format

Table

Categories of grid users considered

Generators and demand

Type of grid connection capacity information

The hosting capacity is categorised into classes: less than 500 MW, 500–1,000 MW, 1,000–1,500 MW, 1,500–2,000 MW, and greater than 2,000 MW. The available capacity for each class is shown. In addition, reserved substations are marked and substations with an oversubscription of requests are also indicated. More information will be displayed shortly.

Availability of API

Not provided

Update Cycles

When needed

Available language

National language(s) only

Additional information

https://www.50hertz.com/de/Vertragspartner/Netzkunden/Netzanschluss 

Hosting capacity assessment

Capacity type considered for hosting capacity information Firm
Description of the methodology that leads to firm capacity results Check for potential violations of the “3 GW criterion” considering customers (DSOs and directly connected units) that are already connected or have a reservation. For substations with four or fewer transmission lines, the maximum transmission line capacity must be considered.
Description for the criteria and methodologies used that lead to the published information For substations where a connection is possible, the firm capacity is displayed.
Main assumptions/disclaimers behind calculations The published information is based on snap shots of the grid development and reserved customer connections, they should be considered as indicative. Recent developments can change the availability and suitability of locations.

Additional information for connection request and hosting capacity information

Connection request procedure

https://www.50hertz.com/xspProxy/api/staticfiles/50hertz-client/dokumente/vertragspartner/netzanschluss/eeg%20und%20kraftnav/kraftnav_abbildungen%20auf%20der%20webseite%20zu%20eeg%20und%20kraftnav.png

https://www.50hertz.com/xspProxy/api/staticfiles/50hertz-client/dokumente/vertragspartner/netzanschluss/eeg%20und%20kraftnav/eeg_abbildungen%20auf%20der%20webseite%20zu%20eeg%20und%20kraftnav.png

Options available for the investors if the map shows 'no capacity available' in their interested area

Wait for an update with available capacity, or contact the TSO for further information.

Connection request rules

First-come-first-serve

Information published for volumes of connection requests/waiting lines

Yes

Granularity of published connection requests/waiting lines

The waiting list for the grid area is published using project numbers, which are assigned to requests once the minimum requirements are met.