CERIUS A/S

DSO - Denmark

Publication info

Publication status Published
Access link to GHC publication of the SO www.kapacitetskort.dk
Access type Open
Geographical Coverage TSO and all DSOs are covered
Spatial granularity Nodal (substation) - only 50/10kV substations and up
Voltage Level Coverage 50 kV and up
Time Horizon (e.g. Y+1, Y+3 / 202x / snapshot) Available capacity for full access and non-firm connections, as well as future available capacity, taking into account network expansions
Data Format (Table, Map, etc.) Map and Table
Grid user types covered Solar - production
Displayed Capacity Type (e.g. available/requested/reserved/connected etc.) Available
API Availability Openly available
Grid hosting capacity downloadable & format Excel format
Update Frequency Quarterly
Available language National language(s) only
Disclaimer & Important Notes Additional information on future development: Capacity available for consumption is under development to be included (expected by mid-June 2026)

Hosting capacity assessment

Capacity type considered for available hosting capacity information (e.g., Firm and/or Flexible) Firm and flexible
Description of what firm capacity means Full access to the required capacity
Description of the aspects/methodology that leads to firm capacity results Grid calculation that provides free capacity for production in MW.
Description of what flexible capacity means (if applicable) The connection is subject to grid availability, and may not guarantee full access at all times. The grid operator can limit or curtail the electricity injected into or withdrawn from the grid.
Description of the aspects/methodology leading to flexible capacity results Grid calculation that provides free capacity for production in MW.
Main assumptions/disclaimers behind calculations The available capacity is determined based on current knowledge of the power system, but does not take into account the physical space for connection in and around existing substations. Other significant factors, such as access to land for the placement of new facilities, have also not been considered.

Additional information for connection request and hosting capacity information

Connection request procedure The grid connection process begins when the customer contacts the relevant grid company. The grid company assesses the connection request and manages the subsequent steps. Depending on the intended connection point, the process will either continue within the grid company or be initiated with Energinet. The further process depends on the voltage level at which the connection is to be established. More information: Nettilslutning | Elnet https://elnet.dk/nettilslutning
Available options for the investors if the map shows “no capacity available” in their interested area The investor can request access from the specific location and wait for capacity to be build and provided.
Connection request rules/principles First come, first served.
Information published for volumes of connection requests/waiting lines No

Relevant references/Links/Additional material

Auxiliary documents
Contact point for hosting capacity information