CERIUS A/S
DSO - Denmark
Publication info
| Publication status | Published |
| Access link to GHC publication of the SO | www.kapacitetskort.dk |
| Access type | Open |
| Geographical Coverage | TSO and all DSOs are covered |
| Spatial granularity | Nodal (substation) - only 50/10kV substations and up |
| Voltage Level Coverage | 50 kV and up |
| Time Horizon (e.g. Y+1, Y+3 / 202x / snapshot) | Available capacity for full access and non-firm connections, as well as future available capacity, taking into account network expansions |
| Data Format (Table, Map, etc.) | Map and Table |
| Grid user types covered | Solar - production |
| Displayed Capacity Type (e.g. available/requested/reserved/connected etc.) | Available |
| API Availability | Openly available |
| Grid hosting capacity downloadable & format | Excel format |
| Update Frequency | Quarterly |
| Available language | National language(s) only |
| Disclaimer & Important Notes | Additional information on future development: Capacity available for consumption is under development to be included (expected by mid-June 2026) |
Hosting capacity assessment
| Capacity type considered for available hosting capacity information (e.g., Firm and/or Flexible) | Firm and flexible |
| Description of what firm capacity means | Full access to the required capacity |
| Description of the aspects/methodology that leads to firm capacity results | Grid calculation that provides free capacity for production in MW. |
| Description of what flexible capacity means (if applicable) | The connection is subject to grid availability, and may not guarantee full access at all times. The grid operator can limit or curtail the electricity injected into or withdrawn from the grid. |
| Description of the aspects/methodology leading to flexible capacity results | Grid calculation that provides free capacity for production in MW. |
| Main assumptions/disclaimers behind calculations | The available capacity is determined based on current knowledge of the power system, but does not take into account the physical space for connection in and around existing substations. Other significant factors, such as access to land for the placement of new facilities, have also not been considered. |
Additional information for connection request and hosting capacity information
| Connection request procedure | The grid connection process begins when the customer contacts the relevant grid company. The grid company assesses the connection request and manages the subsequent steps. Depending on the intended connection point, the process will either continue within the grid company or be initiated with Energinet. The further process depends on the voltage level at which the connection is to be established. More information: Nettilslutning | Elnet https://elnet.dk/nettilslutning |
| Available options for the investors if the map shows “no capacity available” in their interested area | The investor can request access from the specific location and wait for capacity to be build and provided. |
| Connection request rules/principles | First come, first served. |
| Information published for volumes of connection requests/waiting lines | No |