Fluvius

DSO - Belgium

Publication info

Publication status Published
Access link to GHC publication of the SO Capaciteitswijzer — Fluvius Open Data https://opendata.fluvius.be/pages/map_perceel/
Access type Open
Geographical Coverage Flanders DSO - MV level
Spatial granularity Regional
Voltage Level Coverage HV distribution network of the DSO (MV 30-15-10-6 kV)
Time Horizon (e.g. Y+1, Y+3 / 202x / snapshot) Snapshot
Data Format (Table, Map, etc.) Map and Table
Displayed Capacity Type (e.g. available/requested/reserved/connected etc.) Available capacity offtake and production
API Availability Openly available
Grid hosting capacity downloadable & format Open datasets, API, V1:V2;0/V2.1 (OAS3)
Available language National language(s) only
Disclaimer & Important Notes Please note that the available data is only a snapshot. The map does not replace a detailed study. Therefore, the residual capacity for formal connection applications may differ from the data on this map. The map represents an as-is situation of the MV network. Reserved projects are not included in this map. The map may indicate that residual capacity is still available, when in fact it has already been reserved by a previously requested project that has not yet been realised. Additional information: Indication of indicative connection lead time and connection cost for requested capacity

Hosting capacity assessment

Capacity type considered for available hosting capacity information (e.g., Firm and/or Flexible)

Firm

Description of what firm capacity means

Firm capacity in normal operating conditions of the grid, taking into account the N-1 principle

Description of the aspects/methodology that leads to firm capacity results

Calculation of available as-is offtake/injection capacity based on snapshot, excluding pending request or planned investments, and taking into account the N-1 availability of TSO/DSO connections

Description of what flexible capacity means (if applicable)

Not included

Additional information

Additional information on flexible connection: Regulatory framework in the process of translation/ implementation in regional legislation. In anticipation of this, will use market-based flexibility (market flex), fallback flex, and technical flexibility (T-flex).

Additional information for connection request and hosting capacity information

Connection request procedure https://www.fluvius.be/nl
Available options for the investors if the map shows “no capacity available” in their interested area Submit a connection request or contact DSO
Connection request rules/principles First-come-first-serve
Information published for volumes of connection requests/waiting lines Not Applicable

Relevant references/Links/Additional material

Calculation method, disclaimers, and boundaries
Connection request process
Contact point for hosting capacity information
Contact point for connection requests